
Customer requirements:
Get rid of several loose pneumatic components in different areas of their equipment.
Results:
Fluid Power Engineering was able to consolidate all the loose components. The final result consisted of 3 valves, regulator with gauge, pressure relief valve, pressure switch and fittings.
Value to our customer:
A complete package, 100% tested, both pneumatically and electrically.
![]()